• Open Hours: Mon - Fri 9.00 - 18.00 (GMT +4)
  • [email protected]
  • +99412 505 00 56
ARPA Consulting

MENUMENU
  • About
  • Services
  • Spheres
  • Quality Management
  • News
  • Portfolio
  • Contacts

Installation of Meteostation for PV 230 Solar Plant in Alyat

  HomeARPA Consulting  |  ENERGY & ELECTRICITY  |  Installation of Meteostation for PV 230 Solar Plant in Alyat

The overall project objective of the assignment was install meteorological station to regularly obtain relevant data for analyses of meteo situation.

Description of Actual Services Provided by ARPA Staff:

  • Civil works
  • Installation of galvanized fence
  • Installation of posts
  • MEP Works
  • Data Logging
  • Installation of equipment

Post navigation

Previous Previous post: Consultancy Services for Development of the Strategic Plan for Azerishig for 2021-2026 Years, Republic of Azerbaijan
Next Next post: Construction Supervision of Civil Works for Phase 1: Alat Free Economic Zone

Related Projects

Design review of the 230MWac Garadagh Solar PV Power Plant

Consulting Services the diagnostic examination of “Azeristiliktechizat” OJSC’ – technical, organizational and financial situation; elaboration on optimization measures for a stable and reliable district heat supply in Azerbaijan

Power Distribution Enhancement Investment Program, Tranche 1: Project Supervision and Management.

Copyright © 2023 ARPA Consulting. All rights reserved.