Client: Azerishig JSC
Date: 10/2017 – Present
Location: Azerbaijan
The main objective of this project was feasibility study including due diligence for the next step of the rehabilitation of Azerbaijan’s distribution network (Tranche 2 and Tranche 3). The overall objective of the assignment was to identify the least cost and economically viable means to reinforce, upgrade and expand, in further regions of Azerbaijan, the distribution system to achieve reliable access to electricity by 2020 with high reduction of losses. The feasibility study comprehended policy recommendations, a comprehensive electrification and distribution improvement program and detailed case studies.